Delivery Plan
The BIM Overlay to the RIBA Outline Plan of Work, published by the RIBA in 2012 suggests that:
‘To ensure that projects start on the right path, it is likely that the Client Representative and their advisors will prepare a Delivery Plan at the commencement of the project. This would be the primary plan for setting out how project information is to be prepared, who does so, and what protocols and procedures to use. The document would be owned by the client but may be updated and managed using change control as the supply chain procedures and protocols are expanded and agreed. It might contain details of:
- roles, responsibilities and authorities with relevant organograms;
- standard methods and procedures;
- the Employers Information Requirements (EIR); and
- the Project Programme (PP)’
See also: Project execution plan.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.